It is not an easy task, but the end result is worth the effort. The first step is the demolition of the walls and ceilings.

The wood work is generally strong steel, and does not need to be disturbed. If insulation against the weather is desired, the insulation is placed inside the walls at this point.

This can also help to muffle sounds, but will not make the room sound proof. We will discuss sound proofing with other projects at a later time if desired.

If you're looking for professional Plastering Contractor in Boston you can check Boston Plastering Contractor they have excellent team and fast for work .